Important information for drivers:
The island of Murter is connected to the mainland (town of Tisno) by a movable bridge, which regulates the dynamics of sea and road traffic.
Bridge lifting timetable:
15th June – 15th September – every day: 5 pm - 5.30 pm
16th September - 31st May - Monday and Friday: 9 – 9.20 am